Gonzalves, Fransisco (2020) Analisis Beban Kerja Karyawan produksi di UD. Murni Jaya Menggunakan Metode Nasa-TLX dan Work Sampling. Undergraduate thesis, Universitas Katolik Darma Cendika Fakultas Teknik.
Text
COVER.pdf Download (1MB) |
|
Text
BAB I - II.pdf Restricted to Registered users only Download (765kB) |
|
Text
BAB III - V.pdf Restricted to Repository staff only Download (712kB) |
|
Text
BAB VI - DAPUS.pdf Download (427kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) |
Abstract
UD Murni Jaya is a manufacturing company engaged in the production of concrete buis. This study aims to analyze the workload of production employees at UD Murni Jaya and determine the optimal number of employees to complete their work. This study uses a method of measuring physical workload (work sampling) and mental workload NASA - Task Load Index (NASA-TLX). According to the calculation of the standard time as seen from the physical workload of production employees amounting to 105.28 minutes or 1.75 hours. From the work sampling analysis, the average standard time used to complete the production activities of 1 concrete bus/employee is 105.28 minutes or 1.75 hours so that the standard time is still considered normal. The calculation results of NASA-TLX show that the mental workload of employee 1 is 84.7%, employee 2 is 83.3%, employee 3 is 84.7% and employee 4 is 82.7. From the analysis, the Nasa-TLX 4 employee score is 83.83%. Proposed improvements to optimize the workload of 4 production employees, namely adding 1 employee to 5 employees with an average workload of 67.08% so that the workload of employees is still in the medium category. The calculation of the correlation coefficient is used to determine therelationship between standard time and mental load which is expressed by the variables x and y, which is equal to 1.112, it is stated that the perfect correlation.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Standard Time, TLX Nasa, Mental Workload, Work sampling | ||||||||
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management | ||||||||
Divisions: | Fakultas Teknik > Prodi Teknik Industri | ||||||||
Depositing User: | Tegar Wiratama | ||||||||
Date Deposited: | 21 Jan 2022 02:42 | ||||||||
Last Modified: | 21 Jan 2022 02:42 | ||||||||
URI: | http://repositori.ukdc.ac.id/id/eprint/887 |
Actions (login required)
View Item |